| Site Name |
State |
Major Remedial Actions |
Alltift Landfill |
NY |
Landfill Consolidation, Cap, Wetlands Mitigation |
Ashtabula |
OH |
Landfill construction, Sediment removal, dewatering treatment, disposal, capping |
Bay Drum |
FL |
Synthetic Cap, Solidification/Stabilization |
Bayonne Term. |
NJ |
Sheetpile Removal, Relieving Platform Removal and Replacement, Shoreline Construction, Waterfront Development Permitting |
Bayshore |
NY |
Source Excavation/Offsite Disposal, In-Situ ChemOx, Subsurface Containment Barrier, Groundwater Extraction/Treatment, Soil Cap |
Bayonne Barrel |
NJ |
Building Demolition, Tank Cleaning/Removal, Waste Removal |
Bennington Landfill |
VT |
GW Diversion System, Soil Consolidation, Cap |
Blosenski Landfill |
PA |
Synthetic Cap /Drum Removal, Groundwater Pump and Treatment |
Bluff Road |
SC |
Groundwater Pump & Treat System |
Boarhead Farms |
PA |
Groundwater Treatment, Soil Treatment, Drum Removal |
Burgess Brothers LF |
VT |
SVE System Synthetic Cap |
Caldwell Trucking |
NJ |
SVE, Solidification, Permeable Iron Reactive Barrier Wall Installation, Iron Reactor System Installation |
Chemsol |
NJ |
Groundwater Extraction & Treatment, Soil and Waste Removal |
Curtis Bay |
MD |
Decomissioning, Demolition (Top 3 Floors of Operating Facility), Radiological (RAD) Decontamination (5 Floors), Final Status Survey to Industrial Use Standards, Reconstruction of Roof, Disposal of RAD Waste |
D’Imperio |
NJ |
SVE, Pump and Treat |
Eagle Harbor |
WA |
Sediment Dredging, Consolidation, and Capping |
Fields Brook |
OH |
Sediment Clean up |
Fulton Terminals |
NY |
Thermal Treatment / Freeze Wall |
Garland Road |
OH |
Thermal Treatment/Drum Removal |
GE-Erie |
PA |
Clay Cap |
GEMS |
NJ |
Groundwater Extraction & Treatment, Cap Repairs |
Gibson Oil |
CA |
Soil Removal, Transportation, Disposal |
Green River |
KY |
Synthetic Cap |
Grove Street |
MA |
Synthetic Cap, In-Situ Groundwater Treatment |
Gurley |
NC |
Drum/Soil Removal |
Houston Warehouse |
TX |
Warehouse Fire Clean-up |
IJ Recycling |
IN |
Tank / Drum / Soil Removal |
Industri-Plex |
MA |
Cap, Thermal Oxy., Soil Stabilization, Dredging |
Jersey City |
NJ |
Slurry Wall, Groundwater Pump and Treatment, Soil Removal |
L&RR |
RI |
Synthetic Cap |
Lawrence |
MA |
Hydraulic and Mechanical Sediment Dredging, Dewatering, Treatment, Disposal, GWTP Construction and Operation (Long Term Plant), Source Excavation and Disposal |
Liquid Disposal, Inc. |
MI |
Solidification / Stabilization, Slurry Wall |
Marion Bragg |
IN |
Clay Cap |
Maxey Flats |
KY |
Low-level Rad. Leachate Extraction/Solidification, Building demolition, Synthetic Cap, Multi-layer cap, Basins |
METCOA |
PA |
Low-level Rad. Removal |
NMI |
MA |
Drum Excavation (Level B), Handling and Disposal |
Northside Landfill |
IN |
Synthetic Cap and Slurry Wall |
Novak Landfill |
PA |
Synthetic Cap, Stormwater Basins, Leachate Collection |
NY Air Brake |
NY |
Sediment Removal |
Ottawa River |
OH |
Sediment Dewatering Cell Construction, Sediment Dredging, Dewatering, Treatment, Disposal, Water Treatment, Permitting, Capping |
Peak Oil |
FL |
Synthetic Cap, Solidification/Stabilization, Slurry Wall |
Pine Street Canal |
VT |
Sediment Capping |
Revere Chemical |
PA |
Ex-Situ, SVE, Soil Consolidation System |
Rixford |
PA |
Facility Demolition, Removal, Disposal |
SAAD |
TN |
Drum / Soil Removal |
Shaffer Landfill |
MA |
Synthetic Cap, Leachate/Gas Collection System, Wetlands
Restoration |
SRSNE |
CT |
Ongoing Groundwater Extraction/Treatment, Pre-Design Studies including NAPL Delineation, Monitoring Well Abandonment,
Installation and Rehabilitation, Habitat Evaluation |
State Road |
OH |
Source Excavation, DNAPL Interceptor System, DNAPL Extraction/
Treatment |
Tex Tin |
TX |
Landfill Cap, Slurry Wall, On-Site Treatment of Waste, Soil Extraction |
Valley View |
AL |
Leachate / Gas Collection System |
Woodlands Sites
Route 72 & Route 532 |
NJ |
Air Sparging/Soil Vapor Extraction, Oxygen Sparging, Clay Cover, MNA |
York Oil |
NY |
Lagoon, Soil & Sediment Excavation, Solidification/Stabilization, Landfill Capping, Wetlands Restoration, Replacement of Pump and Treat with In-Situ Barrier Wall Using EHC |